INSP-Final Inspection | 9/19/2008 | 9/23/2008 | 9/23/2008 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection.
|
INSP-Sprinkler Rough-in | 8/28/2008 | 8/28/2008 | 8/28/2008 | A | PART |
Forrest France
|
|
|
Okay for cover at the drop ceilings.
|
INSP-Final Inspection | 8/22/2008 | 8/27/2008 | 8/27/2008 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler system modifications at the tenant improvement area are good for cover with the exception of the conference room and east side of the waiting area. One head added due to overspacing is not yet installed, conference room head needs to be piped separately as the number of sprinklers fed from a 1" line is exceeded.
|