Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR08-00592
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 250 S 5TH ST
Project Name 
Customer Number 
ePlanReview 
Description
FIR OH Work Scope:
The fire sprinkler scope consists of modifying the existing wet pipe system by adding 6 and relocating 5 other down heads on the 2nd floor to accommodate a new wall and ceiling layout. The fire sprinkler system alterations / work shall comply with the IFC 2006 & NFPA 13, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD08-01460.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/25/20089/25/20089/25/2008PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in9/16/20089/16/20089/17/2008PPART
DetailsForrest France
Overhead fire sprinkler modifications per the tenant remodel scope are good for cover at the drop ceilings.