Permit Information
Permit NumberFIR08-00647
StatusFinaled
Name COMMERCIAL FIRE PROTECTION
Site Address 4262 N WISTERIA WAY
Project NameVIALPONDO ASSISTED LIVING
Customer Number 
ePlanReview 
Description
10/20/08 Revised FIR Sprinkler Scope:
The plans have been modified to include an UG gate valve both within the calculations and on the site plan submitted. An additional calculation of the ECHSW has been provided for review. This modification is noted as revision 1 and dated 10/07/08.
FIR Sprinkler Scope:
Install a new 13D fire sprinkler system through out the one story single multi dwelling. System shall be equipped with an alarm initiating device and an outside alarm. The system will be supplied from an existing 1” poly dedicated fire line. (by others) All fire sprinkler work and related, which includes a single dedicated service water supply, the system backflow prevention device (provided by others), shall be per NFPA 13D, approved plans, engineering/red-lining and attached review comments, under direction of the Fire Chief. This permit is no other permit attached.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/16/200812/17/200812/17/2008APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection12/12/200812/16/200812/16/2008PPART
DetailsTroy Cobbley
The underground supply flush passed.
INSP-Sprinkler Rough-in12/11/200812/11/200812/11/2008PPASS
DetailsTroy Cobbley
The tenting over the cpvc piping appears to be adequate and can be covered with blow-in insulation.
INSP-Sprinkler Rough-in11/4/200811/5/200811/5/2008APART
DetailsTroy Cobbley
The underground piping can be covered. I still need verification that the installed cpvc piping is adequate as compared to the poly that was shown to be installed.
INSP-Sprinkler Rough-in11/3/200811/4/200811/4/2008APART
DetailsTroy Cobbley
Sprinkler rough-in is basically passed. As-builts are needed showing the pipe routing changes. Resubmittals are needed since tyco heads have been installed instead of the submitted Viking heads. Verification is needed that the cpvc underground piping is equal to or less restrictive than the submitted poly piping. A tenting inspection is needed prior to covering the piping with the blow-in insulation.