INSP-Final Inspection | 12/8/2008 | 12/9/2008 | 12/10/2008 | P | PASS |
Forrest France
|
|
|
Corrections verified for compliance, after hours functional fire alarm testing passed, permit finaled.
|
INSP-Conference | 12/8/2008 | 12/8/2008 | 12/8/2008 | P | DONE |
Forrest France
|
|
|
Regarding site inspection schedule.
|
INSP-Final Inspection | 11/12/2008 | 11/13/2008 | 11/14/2008 | P | FAIL |
Troy Cobbley
|
|
|
The voice evac sytem had bad static and humming in the speakers. The static was not allowing the voice to come thru clearly. KR
|