INSP-Final Inspection | 3/16/2009 | 3/16/2009 | 3/16/2009 | P | PASS |
Forrest France
|
|
|
Noted correction items field verified for completion, fire alarm testing passed, permit finaled.
|
INSP-Conference | 3/6/2009 | 3/6/2009 | 3/6/2009 | P | DONE |
Forrest France
|
|
|
Regarding C/N items.
|
INSP-Final Inspection | 2/18/2009 | 2/19/2009 | 2/20/2009 | A | FAIL |
Forrest France
|
|
|
Items needed for final include lock at circut breaker to the panel, repair one manual pull station at building 1308 1st floor NE side, correct switched descriptors at the first two buildings, resolve issue with note #5 on project attatched fire code review comments.
|
FIR-Aging Inspection | 2/5/2009 | 2/5/2009 | 2/5/2009 | | DONE |
Forrest France
|
|
|
Work in progress
|