INSP-Final Inspection | 3/18/2009 | 3/19/2009 | 3/19/2009 | P | PASS |
Forrest France
|
|
|
Correction items verified for completion, final site alarm testing passed, permit finaled.
|
INSP-Final Inspection | 3/16/2009 | 3/17/2009 | 3/18/2009 | P | PART |
Forrest France
|
|
|
Final pending addition of notification at the breakroom area in the detatched shop building, need to locate knox box per fire dept. instructions-see fire code review note #21, also need to provide a list of signals from field testing completed 3/18.
|
INSP-Alarm Testing | 3/18/2009 | 3/18/2009 | 3/18/2009 | A | PART |
Forrest France
|
|
|
Fire alarm testing completed today includes the new FACP, nac extenders, notification, initiation, and sprinkler monitoring for the main building.
|
FIR-Aging Inspection | 2/4/2009 | 2/4/2009 | 2/4/2009 | P | DONE |
Forrest France
|
|
|
Site visit confirmed work in progress.
|