Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberFIR08-00735
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6032 N FIVE MILE RD
Project NameFive Mile Chinden Church
Customer Number 
ePlanReview 
Description
Scope of Work: UG Only
The scope will begin from a new 6” C-900 UG stub in on the North side of the bldg from an 8” looped main. From there run 60’ of new 6” C900 out then rise up into the riser room of the 16558-ft/2 single story structure. The fire sprinkler underground work shall comply with NFPA 13-2007, NFPA 24-2007 the IFC-2006, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire “Inspection Card” are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD07-02139. The overhead will be submitted under a separate permit
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/2/20104/5/20104/5/2010PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Supply line flush3/3/20093/4/20093/4/2009APASS
DetailsTroy Cobbley
Underground flush passed.
INSP-Sprinkler Rough-in/Hydro3/3/20093/4/20093/3/2009ACANC
DetailsTroy Cobbley
Ryan is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro2/25/20092/25/20092/25/2009PPASS
DetailsTroy Cobbley
UDG Hydrotest pasted held 220# for 2 hours.
INSP-Sprinkler Rough-in/Hydro11/13/200811/14/200811/14/2008ADONE
DetailsTroy Cobbley
Underground OK to cover. KR