INSP-Final Inspection | 3/26/2009 | 3/26/2009 | 3/27/2009 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit work approved for final.
|
INSP-Sprinkler Rough-in | 3/10/2009 | 3/10/2009 | 3/10/2009 | P | PART |
Forrest France
|
|
|
Overhead system modifications for the library and mail rooms are approved for cover, previous correction notice items okayed at the existing corridor.
|
INSP-Sprinkler Rough-in | 1/21/2009 | 1/21/2009 | 1/21/2009 | P | PART |
Forrest France
|
|
|
OH modifications are approved for cover as annotated and initialed with today's date on the approved plans, note two pendent heads at the common corridor to be replaced with matching response and type, mail room not yet finished.
|