INSP-Final Inspection | 11/2/2010 | 11/3/2010 | 11/3/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
|
INSP-Final Inspection | 11/2/2010 | 11/2/2010 | 11/2/2010 | P | CANC |
Troy Cobbley
|
|
|
Cancelled due to time constraints and Guy and my schedule not matching. Guy is rescheduling for first thing in the morning.
|
INSP-Final Inspection | 8/27/2010 | 8/30/2010 | 8/30/2010 | P | FAIL |
Troy Cobbley
|
|
|
The netcon passed but the inspection was stopped since a intella tap was being utilized that is not reflected on the city approved plans.
|
FIR-Aging Inspection | 7/5/2010 | 7/5/2010 | 7/6/2010 | | NR |
Troy Cobbley
|
|
|
Per Bill the scheduling of all of the AES projects is being addressed.
|
INSP-Final Inspection | 4/5/2010 | 4/6/2010 | 4/6/2010 | A | FAIL |
Troy Cobbley
|
|
|
The AES panel only had a Netcon 6. No inspection performed.
|
FIR-Aging Inspection | 4/24/2009 | 4/24/2009 | 4/28/2009 | | NR |
Troy Cobbley
|
|
|
Per Alarmco they are planning to call in inspections for all of their wireless units in the near future.
|