INSP-Final Inspection | 5/28/2009 | 5/29/2009 | 5/29/2009 | A | PASS |
Forrest France
|
|
|
Verified a listed air maintenance device has been installed, fire sprinkler permit approved for final.
|
INSP-Final Inspection | 5/28/2009 | 5/28/2009 | 5/28/2009 | P | FAIL |
Troy Cobbley
|
|
|
Travis Phone #: ###-#### The air compressor/air maintenance device had not been resolved.
|
INSP-Final Inspection | 5/26/2009 | 5/27/2009 | 5/27/2009 | A | FAIL |
Troy Cobbley
|
|
|
As per my discussion with Tim Frost and Greg Patrick the dry system needs to have the air maintenance device installed as per approved drawing note 15 and 18. The air compressor exceeded the 30 pump up time but Jeremy was going to drop the air pressure down 2 or 3 pounds so that the 30 minute limitation is met. All other items including the fire alarm interconnection is complete.
|
INSP-Final Inspection | 5/22/2009 | 5/26/2009 | 5/26/2009 | A | FAIL |
Troy Cobbley
|
|
|
The forward flush passed but the interconnections with the fire alarm panel could not be tested due to problems with the facp.
|
INSP-Final Inspection | 5/22/2009 | 5/22/2009 | 5/22/2009 | P | PART |
Forrest France
|
|
|
Final pending fire alarm system interconnections for riser supervision, trip testing, forward flow, final walkthrough, etc.
|
INSP-Sprinkler Rough-in/Hydro | 5/20/2009 | 5/20/2009 | 5/20/2009 | P | PASS |
Troy Cobbley
|
|
|
The hydro tests for the wet and dry systems passed. The sprinkler piping above the tile ceilings can be covered.
|
INSP-Sprinkler Rough-in | 4/15/2009 | 4/15/2009 | 4/15/2009 | P | PASS |
Troy Cobbley
|
|
|
The remaining piping rough-in for the west end is passed. The blocked upright and the missing upright previously noted have been corrected. A separate rough-in inspection will be required when the drops in the lay-in ceiling areas have been finished.
|
INSP-Sprinkler Rough-in | 4/9/2009 | 4/9/2009 | 4/9/2009 | P | PART |
Troy Cobbley
|
|
|
Todays inspection was for cover under the stairs, which it can be, but brian and I also did a rough-in on the wet system. I found one upright sprinkler head that needs to be relocated away from a 2x4 and one upright that needs to be added as shown on the plans. Also not all heads and lines were installed. These items will be checked when the hydro tests are called in.
|
INSP-Sprinkler Rough-in | 3/18/2009 | 3/19/2009 | 3/19/2009 | A | PASS |
Troy Cobbley
|
|
|
24 hour air test for the overhead dry system passed.
|
INSP-Sprinkler Rough-in/Hydro | 3/18/2009 | 3/18/2009 | 3/18/2009 | P | PASS |
Troy Cobbley
|
|
|
The attic piping/rough-in passed and the piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 3/18/2009 | 3/18/2009 | 3/18/2009 | A | PART |
Troy Cobbley
|
|
|
The 24 hour air test was started at 9:15 with 42 1/2 psi on the guage.
|