INSP-Final Inspection | 7/14/2009 | 7/15/2009 | 7/15/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Conference | 6/25/2009 | 6/25/2009 | 6/25/2009 | P | DONE |
Forrest France
|
|
|
Regarding fire sprinkler system monitoring and interconnect with the FACP.
|
INSP-Supply line flush | 6/5/2009 | 6/8/2009 | 6/8/2009 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed okay. See permit activities for FIR09-00255 regarding line cover inspections done in conjunction for this permit also.
|
INSP-Sprinkler Rough-in | 6/4/2009 | 6/4/2009 | 6/4/2009 | P | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic retest passed.
|