INSP-Final Inspection | 6/10/2009 | 6/12/2009 | 6/12/2009 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 6/10/2009 | 6/12/2009 | 6/10/2009 | P | CANC |
Troy Cobbley
|
|
|
Mike B is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Final Inspection | 5/27/2009 | 5/27/2009 | 5/27/2009 | P | FAIL |
Troy Cobbley
|
|
|
This project can not be finaled because per the scope of work this project has two phases. Only phase one has been completed. Also the 1 1/2" grooved cply closest to the wall is leaking as is the pipe o let. Also the orange shipping clip is still attached to the new pendant in the restroom.
|