INSP-Final Inspection | 6/17/2009 | 6/17/2009 | 6/17/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. It is ok with Tim Frost that the valves remain locked as the previous valves had been and not connected to the existing fire alarm panel.
|
INSP-Sprinkler Rough-in/Hydro | 6/2/2009 | 6/2/2009 | 6/2/2009 | P | PASS |
Troy Cobbley
|
|
|
The underground hydro test passed.
|
INSP-Supply line flush | 6/1/2009 | 6/1/2009 | 6/1/2009 | P | PASS |
Troy Cobbley
|
|
|
The underground flush passed.
|
INSP-Supply line flush | 5/28/2009 | 5/28/2009 | 5/28/2009 | P | CANC |
Troy Cobbley
|
|
|
Brian has not finished installing the piping for the flush. Per conversation this will be rescheduled for tomorrow.
|
INSP-Sprinkler Rough-in | 5/27/2009 | 5/28/2009 | 5/28/2009 | A | PART |
Troy Cobbley
|
|
|
The remaining underground piping can be covered.
|
INSP-Sprinkler Rough-in | 5/20/2009 | 5/21/2009 | 5/21/2009 | A | PASS |
Troy Cobbley
|
|
|
The 6" underground piping from the point of connection up to where the PIV will be installed is ok to cover.
|