Permit NumberFIR09-00476
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 1417 W JEFFERSON ST
Project NameCity Lights
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of providing a 13R fire protection system for a two floor existing building. The piping will be CPVC with predominantly residential sprinklers. A new 2" supply will be connected to a 10" main in Jefferson Street.

(Woman's Dormitory Shelter - Boise Rescue Mission) To remodel an existing 4,452 sq. ft. enclosed parking garage, below existing apartments, for use as a 60 bed Dormitory Shelter for woman and children, with support facilities and administration offices. Work includes fur out of interior of exterior walls and insulating them, interior finishes, new store front door & window assemblies to infill existing garage door openings; an accessible unisex restroom and additional water closets, lavs and showers; electrical, mechanical, plumbing, fire sprinkler and alarm systems work. Site work on near by lot will provide additional parking to serve this facility. There are no food preparation kitchen areas scoped in this permit. Drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/19/200911/20/200911/20/2009APASS
DetailsForrest France
Correction items field verified for compliance, final walkthrough passed, permit finaled.
INSP-Final Inspection11/17/200911/18/200911/18/2009ANR
DetailsForrest France
Final pending the installation of three missing tamper switches at the main control valves for the fire service water supply per IFC 903.4 and permit work fire code review note #10.
INSP-Final Inspection11/17/200911/17/200911/17/2009PPART
DetailsForrest France
Items needed for final include head guards at sprinklers in low ceilings, signage at the antifreeze riser, state fire marshal tags, open the valve to the expansion tank, obstructed head at one closet, all valves controlling the water supply to the fire sprinkler system shall be electrically supervised per IFC 2006 sec. 903.4- see fire code review note #10.
INSP-Sprinkler Rough-in10/27/200910/27/200910/27/2009PPART
DetailsForrest France
Overhead rough-in inspection for the 2nd floor antifreeze system okayed for cover, discussed items remaining for permit final.
INSP-Sprinkler Rough-in/Hydro10/26/200910/27/200910/27/2009APART
DetailsForrest France
2nd floor antifreeze system hydrostatic testing completed acceptable, inspection passed.
INSP-Sprinkler Rough-in/Hydro10/19/200910/19/200910/19/2009APART
DetailsForrest France
Okay to cover 1st floor as noted on stamped plan set.
INSP-Supply line flush10/5/200910/6/200910/6/2009APART
DetailsForrest France
Underground fire supply line flush completed satisfactory.
INSP-Supply line flush10/2/200910/5/200910/5/2009ACANC
DetailsForrest France
Scheduled by a contractor via Hello! on 10/2/2009 at 9:45:50 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Oct 5 2009 7:17AM.
INSP-Sprinkler Rough-in/Hydro10/1/200910/2/200910/2/2009APART
DetailsForrest France
1st floor overhead rough-in inspection is acceptable, minor field mods. okayed, noted one flexible coupling to be added at the feed to the second floor system. Overhead hydrostatic test of the 1st floor also passed.
INSP-Supply line flush10/1/200910/2/200910/2/2009ANR
DetailsForrest France
Scheduled by a contractor via Hello! on 10/1/2009 at 2:35:17 PM. Contact: ###-####.
INSP-Conference9/23/20099/24/20099/24/2009APART
DetailsForrest France
Inspection intended for an underground fire supply line cover, okayed for bury as discussed.
INSP-Conference9/22/20099/23/20099/23/2009ADONE
DetailsForrest France
Regarding fire supply line depth of cover.