Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR09-00484
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 12376 W EXECUTIVE DR
Project NameOregon Tile and Marble -Shell
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of providing a new sprinkler system. The building has an office area, showroom and storage. The system consist of two grids, one grid has a center rail.

The underground piping was approved under permit is FIR09-00435

Oregon Tile and Marble (Shell Only) - To construct a new 28,670 square foot, one story, retail, business and storage shell building and related site improvements. This building is constructed of concrete tilt-up exterior walls, steel structural roof and interior structural supports. The shell will include the construction of a fire riser room and mechanical room. This building is fully fire sprinkled. The sprinklers are used for area increase and S-1 Occupancy fire area. This is shell permit only and no occupancy is allowed under this permit. A separate tenant improvement permit is required to finish this building for occupancy. The plumbing, mechanical and electrical work shown on the approved plans are part of the shell construction. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/5/20102/8/20102/8/2010APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection2/4/20102/5/20102/5/2010PFAIL
DetailsTroy Cobbley
Provide forward flow test of backflow, provide certification of the backflow, provide NFPA 25, provide head wrench, provide service tag on riser and provide signage at the aux. drain on the north wall. The interconnection with the fire alarm panel tested ok.
INSP-Sprinkler Rough-in/Hydro1/11/20101/12/20101/12/2010APASS
DetailsTroy Cobbley
The overhead hydro test passed.
INSP-Sprinkler Rough-in/Hydro1/6/20101/7/20101/7/2010AFAIL
DetailsTroy Cobbley
The overhead hydro test was performed twice today and failed twice.
INSP-Sprinkler Rough-in/Hydro11/10/200911/12/200911/12/2009APASS
DetailsTroy Cobbley
All of the sprinkler piping can be covered except in the show room area.
INSP-Sprinkler Rough-in/Hydro10/22/200910/23/200910/23/2009APASS
DetailsTroy Cobbley
Rough-in inspection mostly passed. I noted one retaining strap missing, T-bar was not installed and will require a separate inspection and the showroom piping was not accessible for inspection. The hardlid areas are ok for cover.
INSP-Supply line flush10/22/200910/22/200910/22/2009PCANC
DetailsTroy Cobbley
The wrong permit number was called in for the underground flush.