INSP-Final Inspection | 5/3/2010 | 5/3/2010 | 5/3/2010 | P | PASS |
Forrest France
|
|
|
Underground fire supply line permit okay for final status.
|
INSP-Supply line flush | 3/22/2010 | 3/22/2010 | 3/22/2010 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed acceptable.
|
INSP-Sprinkler Rough-in/Hydro | 3/18/2010 | 3/22/2010 | 3/22/2010 | A | PART |
Forrest France
|
|
|
Underground fire supply line hydrostatic test passed.
|
INSP-Supply line flush | 12/1/2009 | 12/1/2009 | 12/1/2009 | P | PART |
Forrest France
|
|
|
Inspection intended for an UG cover-The remainder of fire supply line piping is approved for bury.
|
INSP-Sprinkler Rough-in/Hydro | 10/26/2009 | 10/26/2009 | 10/26/2009 | A | PART |
Forrest France
|
|
|
Okayed portions per dated notations on stamped plans.
|
INSP-Supply line flush | 8/28/2009 | 8/31/2009 | 8/31/2009 | A | PART |
Forrest France
|
|
|
UG fire supply line ductile riser and stub out to the first 90 are approved for bury- see annotations and initials on stamped plan set.
|