INSP-Final Inspection | 8/8/2011 | 8/9/2011 | 8/9/2011 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 7/27/2011 | 7/28/2011 | 7/28/2011 | A | CANC |
Troy Cobbley
|
|
|
Cancelled due to time constraints and inspection load.
|
INSP-Final Inspection | 7/27/2011 | 7/27/2011 | 7/28/2011 | P | CANC |
Troy Cobbley
|
|
|
Colton Phone #: ###-####
|
FIR-Aging Inspection | 4/25/2011 | 4/25/2011 | 4/25/2011 | | NR |
Troy Cobbley
|
|
|
Work is in progress per Brian
|
INSP-Final Inspection | 2/3/2011 | 2/11/2011 | 2/11/2011 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Brian
|
FIR-Aging Inspection | 1/5/2011 | 1/5/2011 | 1/12/2011 | | NR |
Troy Cobbley
|
|
|
I left a message on Charlie's voice mail requesting project status.
|
INSP-Final Inspection | 6/29/2010 | 6/30/2010 | 6/30/2010 | A | FAIL |
Troy Cobbley
|
|
|
There were no approved drawings on site. The Netcon was verified at 5 and signals were received at the monitoring station. The wrong sized battery was installed as well.
|
FIR-Aging Inspection | 2/18/2010 | 2/18/2010 | 2/26/2010 | | NR |
Troy Cobbley
|
|
|
work is in progress
|