Permit Information
Permit NumberFIR09-00692
StatusFinaled
Name DOHERTY ELECTRIC
Site Address 2748 S VICTORY VIEW WAY
Project NameVIC PARK BUILDING #3-BRINKS SE
Customer Number 
ePlanReview 
Description
This fire alarm permit is to provide voluntary notification devices, heat detectors, and smoke detectors for a new tenant in an existing building. The new initiating devices will be connected to the existing building fire alarm panel, and the new notification devices will be connected to a new power module. Any HVAC monitoring or door release functions are not shown as part of this scope of work and shall require a separate permit.

Associated building permit: BLD09-01742 (BRINKS) New tenant in 6,042 sq. ft. vacant space created under BLD09-01867, part of a 32,350 sq. ft. existing shell building per approved plans. Work to include select demolition of floor & wall to install interior concrete footings for interior masonry walls and vault slab and new window & man door; frame wall construction to create administrative offices, conference room and support areas; new overhead doors, mandoor & exterior window; access control hardware for this security facility with doors openable from egress side per section 1008.1.8, 2006 IBC; structural modifications for support of exterior walls at new openings and roof structure for HVAC units per plans; two fully accessible restrooms (men / women):interior finishes and upgrade of electrical, mechanical, plumbing, sprinkler and alarm systems. Shell building was constructed under permit BLD07-00737. NOTE: This building is fully fire sprinklered. drs CZC09-00181
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/12/20102/16/20102/16/2010APASS
DetailsTroy Cobbley
Permit finaled. The NAC wiring as shown on the plans is supposed to be 12ga but 14ga has been installed. The fire alarm vendor provided revised plans and calculations for the 14ga wire.
INSP-Final Inspection2/12/20102/12/20102/12/2010PFAIL
DetailsTroy Cobbley
The heat detectors in the garage need to be mounted at the ceiling as discussed, the a/v needs to be relocated within 15' of the end of the corridor, the NAC panel does not report trouble signals to the FACP. No devices have been tested or the a/v's activated and the interconnection between the NAC and the existing FACP has not been verified.
INSP-Sprinkler Rough-in/Hydro2/12/20102/16/20102/12/2010ACANC
DetailsTroy Cobbley
Tom is the onsite contact his no. is ###-####. Inspection requested from web by: Shawna Gates Phone #: ###-#### Inspection cancelled from web by: Shawna Gates
INSP-Final Inspection2/11/20102/12/20102/12/2010AFAIL
DetailsTroy Cobbley
No testing performed this morning since the electrician is still wiring up the panel and is having trouble finding the EOL on the door circuit.
INSP-Final Inspection2/11/20102/11/20102/11/2010PCANC
DetailsTroy Cobbley
Cancelled due to too many inspections, time constraints and Micron plan review. Inspection was originally scheduled for this morning but was changed to an afternoon. I spoke to the contractor about performing a morning inspection but he wanted an afternoon inspection. To be rescheduled for tomorrow.
INSP-Final Inspection2/9/20102/11/20102/11/2010ACANC
DetailsTroy Cobbley
I spoke to Tom and he stated that his office shoud be rescheduling for this afternoon.