The Fire Sprinkler Scope of work consists of approximately 100'± of 8" C-900 CPVC underground piping with associated fittings and thrust blocks.

Building permit was not defined when this permit was reviewed.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/9/20103/9/20103/9/2010PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in3/8/20103/9/20103/9/2010APASS
DetailsTroy Cobbley
Permit finaled
INSP-Supply line flush2/9/20102/10/20102/10/2010APASS
DetailsTroy Cobbley
The underground supply line flush passed.
INSP-Supply line flush2/8/20102/9/20102/9/2010AFAIL
DetailsTroy Cobbley
The underground flush was not performed. Roy said they were not ready to go since he was missing the key.
INSP-Sprinkler Rough-in/Hydro2/8/20102/8/20102/8/2010PPASS
DetailsTroy Cobbley
The underground hydro test passed.
INSP-Sprinkler Rough-in/Hydro1/28/20101/29/20101/29/2010APASS
DetailsTroy Cobbley
The underground sprinkler piping is ok to cover. The original plans were not on site but copies had been provided. I spoke to John with Commercial Fire and asked him to please have the original plans on site for the next inspection. I marked the copies that were on site with what I saw in the underground trench.
INSP-Sprinkler Rough-in1/27/20101/28/20101/28/2010ACANC
DetailsTroy Cobbley
ug cover//Terry Nelson ###-#### Inspection cancelled from web by: John Warnick