INSP-Final Inspection | 5/17/2010 | 5/18/2010 | 5/18/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. The originally submitted model of panel has been installed. The Netcon for this panel was a 5 as well.
|
INSP-Alarm Testing | 4/30/2010 | 5/3/2010 | 5/3/2010 | A | FAIL |
Troy Cobbley
|
|
|
Provide resubmittals that reflect the correct model of AES installed with the intellitap, provide correct size of battery and provide the map for the facp. The netcon was verified at 5. No alarm, trouble or supervisiory signals were verified.
|
FIR-Aging Inspection | 4/22/2010 | 4/22/2010 | 4/30/2010 | | NR |
Troy Cobbley
|
|
|
Per mike this inspection will be called in for next week.
|