INSP-Final Inspection | 12/8/2010 | 12/8/2010 | 12/8/2010 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
FIR-Aging Inspection | 11/23/2010 | 11/23/2010 | 11/30/2010 | | NR |
Troy Cobbley
|
|
|
work is in progress
|
INSP-Sprinkler Rough-in | 11/29/2010 | 11/29/2010 | 11/29/2010 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the office where the sprinkler piping can be covered.
|
INSP-Sprinkler Rough-in | 9/1/2010 | 9/1/2010 | 9/1/2010 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations were the sprinkler piping can be covered. It will have todays date.
|
INSP-Sprinkler Rough-in | 7/14/2010 | 7/14/2010 | 7/14/2010 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping in phase 3B is ok to cover. See the city approved plans marked with todays date for specific area.
|
INSP-Final Inspection | 5/18/2010 | 5/18/2010 | 5/18/2010 | P | PASS |
Troy Cobbley
|
|
|
The fire sprinkler work in phase two passed inspection
|
INSP-Sprinkler Rough-in | 5/11/2010 | 5/12/2010 | 5/12/2010 | A | PASS |
Troy Cobbley
|
|
|
The phase 2 sprinkler piping is ok to cover.
|
INSP-Final Inspection | 4/8/2010 | 4/8/2010 | 4/8/2010 | P | PART |
Troy Cobbley
|
|
|
The phase 1 fire sprinkler work is passed.
|
INSP-Sprinkler Rough-in | 3/19/2010 | 3/22/2010 | 3/22/2010 | A | PASS |
Troy Cobbley
|
|
|
The phase 1 sprinkler piping, as marked and dated on the plans, is ok to cover.
|