INSP-Final Inspection | 2/23/2011 | 3/2/2011 | 3/2/2011 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 1/5/2011 | 1/5/2011 | 1/5/2011 | P | FAIL |
Troy Cobbley
|
|
|
All signals tested okay except there was no access to inspector's test switch to verify water flow switch activation. Provide 7.5ah battery.
|
INSP-Final Inspection | 12/28/2010 | 12/28/2010 | 12/28/2010 | P | FAIL |
Troy Cobbley
|
|
|
No city approved plans on site. No inspection was performed.
|
FIR-Aging Inspection | 12/15/2010 | 12/15/2010 | 12/16/2010 | | NR |
Troy Cobbley
|
|
|
Per Brett he is waiting on a points map for the facp and then will call in the inspection.
|
INSP-Final Inspection | 3/23/2010 | 3/23/2010 | 3/23/2010 | P | CANC |
Troy Cobbley
|
|
|
Tim Christopherson Inspection requested from web by: Diane Turner Phone #: ###-#### Inspection cancelled from web by: Diane Turner
|