Permit Information
Permit NumberFIR10-00128
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 250 E PARKCENTER BLVD
Project NameSupervalu-1st floor phase B
Customer Number 
ePlanReview 
Description
Quick Permit
Plan Mod
Relocating and adding 7 sprinklers due two coolers being relocated.

Adding and relocating sprinklers to accommodate a new tenant improvement. All sprinklers are being changed to quick response. The existing system is a grid with a 3"x2 1/2"x1 1/2" pipe sizing. Hydraulics were not required because the existing system was calculate based on ordinary hazard group I. The new area is office which is light hazard. With the use of QR sprinklers the remote area would only be 900 sf. Which is considerably less than the original demand.
(Supervalu - General Office 1st floor - phase B)First floor remove selected walls, doors, frames, finishes and new system furniture. New mechanical and electrical work to be done. Fire sprinkler and alarm work per NFPA must be submited to fire planreview .
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/1/20107/1/20107/1/2010APASS
DetailsForrest France
Final walkthrough passed, fire sprinkler permit work completed.
INSP-Sprinkler Rough-in5/10/20105/11/20105/11/2010APART
DetailsForrest France
Overhead rough-in approved for cover, field modifications okayed.
INSP-Sprinkler Rough-in5/7/20105/7/20105/10/2010APART
DetailsForrest France
Rough-in okay at coolers
INSP-Sprinkler Rough-in4/19/20104/20/20104/20/2010ADONE
DetailsForrest France
Contact phone #: ###-#### Refer to permit activity notes per T.C.
INSP-Conference4/20/20104/20/20104/20/2010PDONE
DetailsTroy Cobbley
Lonnie and I discussed pendant sprinkler head locations and obstructions at the building columns.
INSP-Sprinkler Rough-in4/19/20104/19/20104/20/2010PPASS
DetailsTroy Cobbley
The sprinkler piping at the two relocated coolers on the north side of the building is ok to cover.
INSP-Sprinkler Rough-in4/9/20104/9/20104/9/2010PPART
DetailsForrest France
In progress