Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberFIR10-00133
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 11311 W CHINDEN BLVD
Project NameHP BLDG 4-3RD FLOOR
Customer Number 
ePlanReview 
Description
5/27/10 PLAN MODFIICATION
This plan modification is to omit notification previously submitted due to the floorplan being modified from the original submittal. Several areas previously submitted as new/remodeled are no longer being modified under this permit; therefore the existing devices are to remain.

3/30/10: This fire alarm permit is to provide notification, a new NAC panel, and a duct detector to accommodate a tenant remodel. Some notification will be tied in to existing NAC '300', and the remaining new devices will be tied in to the new NAC panel (NAC '400'). NACs 300 & 400 are located in Electrical Room 308.

Associated building permit: BLD10-00198 (HEWLETT-PACKARD) (BLDG 4-THIRD FLOOR) Remodel third floor office in existing building per approved plans. Work to include select interior demolition; construction of new walls to create Lab, Set Up / Repair, Training Rooms, E-Club, Focus Rooms and mini conference rooms; upgrade electrical, mechanical, sprinkler and alarm systems. NOTE: This building is fully fire sprinklered for allowable area increase per the 1988 UBC, original code of review. Drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/7/20106/8/20106/8/2010APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection5/19/20105/20/20105/20/2010AFAIL
DetailsTroy Cobbley
Plan modifications need to be submitted showing the Focus rooms being deleted. The new NAC panel has been mounted on the wall but is not connected to anything. All fire alarm devices were tested for the training rooms. Once the scope of work has been modifed this permit can be finaled. A separate permit will be required when the new NAC is powered/connected and the Focus Rooms are built.
INSP-Final Inspection5/18/20105/19/20105/19/2010AFAIL
DetailsTroy Cobbley
No inspection was performed since the scope of work has changed by the focus rooms not being installed. Plans will need to be submitted showing the modified scope of work.
INSP-Conference5/18/20105/18/20105/18/2010PDONE
DetailsTroy Cobbley
Corrdinated with mark to meet just after 7:00am