INSP-Final Inspection | 2/9/2011 | 2/9/2011 | 2/9/2011 | P | PASS |
Forrest France
|
|
|
Underground fire supply line permit finaled.
|
FIR-Aging Inspection | 2/9/2011 | 2/9/2011 | 2/9/2011 | | DONE |
Forrest France
|
|
|
Scope of permit work is finished.
|
FIR-Aging Inspection | 12/10/2010 | 12/10/2010 | 12/13/2010 | | DONE |
Forrest France
|
|
|
In progress
|
INSP-Supply line flush | 10/7/2010 | 10/7/2010 | 10/8/2010 | P | PART |
Forrest France
|
|
|
Underground fire supply line hydrostatic test and flushing completed acceptable. Hydro completed 10/6, flushing done 10/7.
|
INSP-Sprinkler Rough-in | 9/17/2010 | 9/17/2010 | 9/17/2010 | P | PASS |
Troy Cobbley
|
|
|
The remaining underground supply piping to the property line can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 4/19/2010 | 4/20/2010 | 4/20/2010 | A | PASS |
Troy Cobbley
|
|
|
Todays inspection was only for cover of the inbuilding riser/stub out.
|
INSP-Sprinkler Rough-in | 4/19/2010 | 4/19/2010 | 4/19/2010 | P | FAIL |
Troy Cobbley
|
|
|
The work is not complete, thrust block missing, and there were no approved plans on site.
|