INSP-Final Inspection | 7/6/2010 | 7/6/2010 | 7/6/2010 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 7/2/2010 | 7/2/2010 | 7/2/2010 | A | PART |
Forrest France
|
|
|
Demising wall construction in progress.
|
INSP-Final Inspection | 5/14/2010 | 5/14/2010 | 5/14/2010 | P | CANC |
Troy Cobbley
|
|
|
Project is not ready for a final inspection. See the rough-in inspection entry.
|
INSP-Sprinkler Rough-in | 5/14/2010 | 5/14/2010 | 5/14/2010 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping has been installed per plans. The new walls have not been installed yet can not final until wall/sprinkler coverage can be verified.
|
INSP-Sprinkler Rough-in | 5/11/2010 | 5/11/2010 | 5/11/2010 | P | DONE |
Forrest France
|
|
|
Regarding upright coverage at the proposed entry vestibule, pendent spacing at one office, repair of existing fireproofing at beams.
|