INSP-Final Inspection | 8/26/2010 | 8/27/2010 | 8/27/2010 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit final approved.
|
INSP-Final Inspection | 8/10/2010 | 8/10/2010 | 8/11/2010 | P | NR |
Forrest France
|
|
|
|
INSP-Final Inspection | 8/6/2010 | 8/9/2010 | 8/9/2010 | P | PART |
Forrest France
|
|
|
Correction items verified for completion. Final pending project related fire alarm permit work.
|
INSP-Sprinkler Rough-in | 7/20/2010 | 7/21/2010 | 7/21/2010 | A | PART |
Forrest France
|
|
|
Previous correction items verified, overhead rough-in inspection passed. Discussed fire alarm final with contractor on site.
|
INSP-Sprinkler Rough-in | 7/19/2010 | 7/20/2010 | 7/20/2010 | A | FAIL |
Forrest France
|
|
|
Corrections include one overspaced head at a bedroom, obstructed heads at the laundry and kitchen areas, a section of piping at the attic is missing tenting. See plans for marked locations.
|
INSP-Sprinkler Rough-in | 7/16/2010 | 7/19/2010 | 7/19/2010 | A | FAIL |
Troy Cobbley
|
|
|
I met Mike and Jared on site but there were no city approved plans to perform an inspection with. No inspection was performed.
|
INSP-Supply line flush | 7/16/2010 | 7/19/2010 | 7/19/2010 | A | PASS |
Troy Cobbley
|
|
|
The underground flush passed.
|
INSP-Sprinkler Rough-in | 7/14/2010 | 7/15/2010 | 7/15/2010 | A | PASS |
Troy Cobbley
|
|
|
The 2" underground supply piping is ok to cover.
|