Permit Information
Permit NumberFIR10-00257
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 276 W BOBWHITE CT
Project NameBarbacoa Resturant Rebuild
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of providing fire protection for a new restaurant. The restaurant is designed for light hazard except the kitchen area, which is designed for ordinary hazard group 1. A new 6” C-900 underground main will supply a new 3” riser with 3” backflow preventer. The system is designed utilizing a grid type layout with 3”x2”x1¼” pipe sizing and quick response sprinklers. There is above and below protection throughout the building due to wood construction.

Barbacoa Restaurant Rebuild and Addition - To rebuild an 8,170 square foot, one story, wood framed restaurant building that was destroyed by fire. The building is being reconstructed from the existing foundation up. There will also be a new 310 square foot main entry area addition on the west side of the building and a new 795 square foot addition along the south side of the building. The roof height will be increased approximately 8 feet above the original building roof height. All construction per the approved plans and attached comment list. JCM

Plan Mod

The Plan Mode Scope consists of adding four extended coverage sprinklers below a huge picture frame.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/29/201012/30/201012/30/2010APASS
DetailsForrest France
Correction items field verified. Final inspection passed. Fire sprinkler permit finaled.
INSP-Final Inspection12/28/201012/29/201012/29/2010APART
DetailsForrest France
Added EC heads okayed and verified per resubmitals. Final walkthrough passed with the exception of three areas in need of revision including provide matched temp. heads at the second floor stairway, amend blocked coverage at the main entry lobby, add protection under a new raised equipment access deck at the attic space.
INSP-Conference12/3/201012/3/201012/3/2010PDONE
DetailsForrest France
Regarding project schedule.
INSP-Sprinkler Rough-in/Hydro10/13/201010/14/201010/15/2010PPART
DetailsForrest France
Overhead hydrostatic test of the new wet system completed satisfactory.
INSP-Supply line flush10/6/201010/7/201010/7/2010APART
DetailsForrest France
Underground fire supply line flushing completed satisfactory.
INSP-Sprinkler Rough-in/Hydro10/5/201010/5/201010/6/2010PPASS
DetailsForrest France
Underground fire supply line hydrostatic test passed.
INSP-Sprinkler Rough-in9/2/20109/3/20109/3/2010APART
DetailsForrest France
See annotations marked on approved plans for locations of areas inspected today.