Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR10-00376
StatusFinaled
Name NORTHWEST SALES COMPANY
Site Address 101 S CAPITOL BLVD Unit: 1900
Project NameUS Bank - Stoel Rives
Customer Number 
ePlanReview 
Description
This quick permit is to relocate an existing speaker strobe on the 19th floor, add a speaker strobe and increase the candela rating on another on the 20th floor to accomodate a tenant improvement. Initiating devices are not part of this permit scope of work. There are no written review comments. Approval is subject to field measurement of the EOL voltage drop. The voltage drop calculations are based on a 10% drop, therefore the minimum acceptable voltage is 21.6V with the AC power off. Any measurement below this voltage will be considered insufficient to run the NACs at the end of useful battery life of 20.4V. UL 864, Standard for Control Units for Fire Signaling Systems. The installing contractor shall have available at final inspection a voltage meter and measure end of line voltages; witnessed by the field inspector
Associated building permit: BLD10-01238 (STOEL RIVES, LLP - US Bank - 19th and 20th floor) Permit is to remodel an existing 24,852 square foot office space to 15,366 square feet by eliminating floor 18 as being part of this tenant. Permit BLD10-01203 was issued to fill in the opening between the 18th and 19th and move in a new tenant into the 18th floor area. Approval contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing walls to create three conference rooms within the space, installation of new doors / hardware, installation of new tempered glazing, new lighting, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/27/20109/27/20109/27/2010PPASS
DetailsForrest France
Fire alarm work passed functional testing, permit finaled.