Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR10-00502
StatusFinaled
Name TAYLOR BROTHERS FIRE & SAFETY
Site Address 500 S 8TH ST
Project NameCreative Access Arts Center
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of installing approximately 10’ of 6” DI underground and yard PIV.

Contractor’s Note: Final
In order to ‘Final’ the underground independently from the overhead piping the underground must be a separate permit.


Building Department Scope:

The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. These changes may affect the sprinkler system. The sprinkler contractor will be required to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit they will do so on their own cognizance
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/5/201011/8/201011/8/2010APASS
DetailsForrest France
Underground fire supply line permit work approved for final status.
INSP-Supply line flush11/4/201011/4/201011/5/2010PPART
DetailsForrest France
Underground fire supply line flush completed satisfactory.
INSP-Sprinkler Rough-in10/22/201010/22/201010/22/2010PPASS
DetailsTroy Cobbley
The under ground hydrostatic test passed.
INSP-Sprinkler Rough-in10/18/201010/18/201010/18/2010APART
DetailsForrest France
Yard PIV approved for cover.
INSP-Sprinkler Rough-in10/14/201010/14/201010/15/2010PPART
DetailsForrest France
UG fire supply line approved for bury.