INSP-Final Inspection | 2/14/2011 | 2/14/2011 | 2/14/2011 | P | PASS |
Forrest France
|
|
|
Scope of quick permit work approved for final status.
|
INSP-Final Inspection | 2/11/2011 | 2/14/2011 | 2/14/2011 | A | PART |
Forrest France
|
|
|
Final pending program change for the dry system pressure switch at the FACP and outside bell connection. Walkthrough passed, trip testing completed okay. Need to forward flow the DCVA.
|
INSP-Final Inspection | 2/2/2011 | 2/3/2011 | 2/3/2011 | A | CANC |
Forrest France
|
|
|
Mike B is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Final Inspection | 2/2/2011 | 2/4/2011 | 2/2/2011 | A | CANC |
Forrest France
|
|
|
Mike B is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Final Inspection | 1/26/2011 | 1/28/2011 | 1/28/2011 | A | NR |
Forrest France
|
|
|
Mike B is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 12/29/2010 | 12/30/2010 | 12/30/2010 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler work per the scope of quick permit is approved for ceiling cover.
|