INSP-Final Inspection | 9/6/2011 | 9/8/2011 | 9/8/2011 | A | PASS |
Forrest France
|
|
|
Corrections finished. Remainder of the new fire alarm system passed inspection and testing. Permit finaled.
|
INSP-Final Inspection | 8/30/2011 | 9/1/2011 | 9/1/2011 | A | PART |
Forrest France
|
|
|
Noted items include; two manual pull stations at the 1st floor to be relocated, provide elevator hat flash upon machine room smoke detection, lock at the breaker to the FACP, signage at the door to the panel room, cd settings at the womens RR basement, 1st and 2nd floors to be adjusted, wall mount strobes in the ceiling position at two mens RR, existing knox box is located distant from the new RA. Functional testing for the new voice evac and PA system passed.
|