INSP-Final Inspection | 5/27/2011 | 5/27/2011 | 5/27/2011 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit final approved.
|
INSP-Final Inspection | 5/25/2011 | 5/25/2011 | 5/25/2011 | A | PART |
Forrest France
|
|
|
Okay for final when ceiling is complete at the comm. closet.
|
INSP-Final Inspection | 5/18/2011 | 5/18/2011 | 5/18/2011 | P | PART |
Forrest France
|
|
|
Final pending drop ceiling at the electrical/comm closet.
|
INSP-Sprinkler Rough-in/Hydro | 3/25/2011 | 3/29/2011 | 3/29/2011 | A | PART |
Forrest France
|
|
|
Overhead work is okay for cover. Need to provide area separation at the new head in the electrical/comm. closet as discussed.
|