INSP-Final Inspection | 5/20/2011 | 5/23/2011 | 5/23/2011 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final inspection.
|
INSP-Final Inspection | 5/17/2011 | 5/18/2011 | 5/18/2011 | A | PEND |
Forrest France
|
|
|
Scheduled in conjunction with Life safety final Phone #: ###-#### >> Inspection requested via web by Wayne Berry
|
INSP-Sprinkler Rough-in/Hydro | 5/12/2011 | 5/12/2011 | 5/12/2011 | P | PART |
Forrest France
|
|
|
Overhead work okayed as noted on plans with the exception of four heads at cloud ceilings and one pendent at the grid ceiling not yet installed.
|
INSP-Sprinkler Rough-in | 5/12/2011 | 5/13/2011 | 5/12/2011 | A | CANC |
Forrest France
|
|
|
Meet at the Fab 1 cooling towers. I''ll have a print. Phone #: ###-#### >> Inspection requested via web by John Wheeler Inspection cancelled from web by: John Wheeler
|