INSP-Final Inspection | 8/16/2011 | 8/16/2011 | 8/17/2011 | A | PASS |
Forrest France
|
|
|
Fire alarm permit finaled.
|
INSP-Final Inspection | 8/10/2011 | 8/10/2011 | 8/12/2011 | P | PEND |
Forrest France
|
|
|
Acceptance test and permit final pending provision for conditions indicated per NFPA 750 sec. 7.8.1.5 (valve identification), 7.8.1.8 (valve supervision), 7.9.2.4 (alarms), IFC 904.3.5 (monitoring), and NFPA 25 13.3.1.3.(control valves in water-based fire protection systems). Valves on connections to water supplies, sectional control and isolation valves, and other valves in supply pipes to nozzles and other fixed water-based fire suppression systems shall be supervised (1)-(4). 7.9.2.4.2- Trouble and supervisory signals shall include operation of monitored valving.
|