Permit Information
Permit NumberFIR11-00293
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 350 N 9TH ST Unit: 300
Project NameMetageek TI
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of adding, relocating and deleting sprinklers to accommodate new wall and ceiling constructions. The new and existing walls go to the ceiling. There is protection below the ceiling only.


Building Department Scope:

Permit is to combining suite 300 with suite 304 to create a 6,787 square feet office space. This building is fully fire sprinklered for area increase. Approval contingent upon adhering to the approved plans on file and plan review report. Work to include: installation / demolition of interior partition walls, installation of new lighting, installation of new doors / accessible hardware, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**TLW**


Fire Sprinkler System Design/Spacing:

The existing system is a double tree with 2½” feed and cross mains, the branch lines are telescoping. This project is located on the 3rd floor of the five story building. The building is equipped with a 750 Gpm @ 70 Psi fire pump. The changes do not required a new set of hydraulic calculations.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/14/20117/14/20117/14/2011APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Sprinkler Rough-in6/29/20116/29/20116/29/2011PPART
DetailsForrest France
OH work okay to cover, noted correction item finished.
INSP-Sprinkler Rough-in6/23/20116/24/20116/24/2011APART
DetailsForrest France
Overhead fire sprinkler system modifications at the tenant remodel are approved for cover. One high temp. head at the group meeting room needs replaced with an ordinary temp. rated head to match the remainder of sprinklers in the compartment per NFPA 13 8.3.2.1.