INSP-Final Inspection | 12/30/2011 | 1/4/2012 | 1/4/2012 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 12/30/2011 | 1/3/2012 | 12/30/2011 | A | CANC |
Troy Cobbley
|
|
|
Randy Russmen will be the contact. Phone #: ###-#### >> Inspection requested via web by joe fink Inspection cancelled from web by: joe fink
|
INSP-Conference | 12/13/2011 | 12/13/2011 | 12/13/2011 | P | DONE |
Troy Cobbley
|
|
|
Chris with ESI and myself discussed the requirements for notification devices that will need to be installed in the new four person offices. There are two of these offices. I also verified spacing for the new notification device that was added in the conference room as referenced on the previous correction notice.
|
INSP-Final Inspection | 10/31/2011 | 11/2/2011 | 10/31/2011 | A | CANC |
Troy Cobbley
|
|
|
This inspection will need to be performed at 7:30am. Phone #: ###-#### >> Inspection requested via web by David Dilley Inspection cancelled from web by: David Dilley
|
INSP-Final Inspection | 10/27/2011 | 10/31/2011 | 10/31/2011 | A | FAIL |
Troy Cobbley
|
|
|
All items are ok and work is complete in the new T.I. area, including EOL voltage drops, except that Winco is using a large existing office in the very north east corner of the building for a conference room/break room. This area will require a notification device. Per the onsite verbal agreement this single notification add will be handled with an as-built.
|