Permit Information
Permit NumberFIR11-00327
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 805 W IDAHO ST
Project NameBoise City Nat Bank - 4th Flr
Customer Number 
ePlanReviewNo
Description

The Fire Sprinkler Scope of work consists of changing all sprinklers on the fourth floor and fourth floor mezzanine to quick response type. In addition, three sprinklers will be plugged and one new upright added due to a ceiling area being removed.


Building Department Scope:

There is no associate building permit. The work is entirely fire sprinkler related.


Fire Sprinkler System Design/Spacing:

The existing demand was reported as 395.3 Gpm @ 46.6 Psi. The new flow test information (green curve) provided is less than the original flow test (blue dashed). However, the demand is still below the available water supply curve (red curve). (See curve below) Therefore, new hydraulic calculations are not necessary.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/31/201110/31/201110/31/2011PPASS
DetailsForrest France
Fire sprinkler permit final approved.
INSP-Sprinkler Rough-in/Hydro10/31/201110/31/201110/31/2011PPART
DetailsForrest France
Overhead hydrostatic test completed.
INSP-Final Inspection7/25/20117/25/20117/26/2011PPART
DetailsForrest France
Final pending hydrostatic testing per NFPA 25 table 5.5.1 component replacement action requirements. Walkthrough completed acceptable.