INSP-Final Inspection | 12/7/2011 | 12/7/2011 | 12/7/2011 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 10/11/2011 | 10/12/2011 | 10/12/2011 | A | PASS |
Troy Cobbley
|
|
|
See the area with todays date where sprinkler piping can be covered.
|
INSP-Final Inspection | 9/6/2011 | 9/6/2011 | 9/6/2011 | P | CANC |
Troy Cobbley
|
|
|
Wrong permit called for inspection per Lonnie.
|
INSP-Sprinkler Rough-in/Hydro | 9/1/2011 | 9/2/2011 | 9/2/2011 | A | PASS |
Troy Cobbley
|
|
|
Above ground hydro test and rough-in passed. See city approved plans for minor corrections needed prior to a final sign off.
|
INSP-Sprinkler Rough-in | 8/18/2011 | 8/18/2011 | 8/18/2011 | P | PART |
Forrest France
|
|
|
Overhead rough-in at the new restrooms as marked on approved plan set with today's date are approved for ceiling cover.
|
INSP-Sprinkler Rough-in | 8/17/2011 | 8/17/2011 | 8/17/2011 | P | CANC |
Troy Cobbley
|
|
|
Canceled due to inspection load and time constraints. No inspection performed.
|