Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR11-00341
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 650 N ARMSTRONG PL
Project NameWinco Foods Office TI
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of adding and relocating sprinklers to accommodate new wall and ceiling configuration. The existing system is a 3”x2½x1¼” grid.


Building Department Scope:

Winco General Office Remodel - To convert an existing 7,710 square foot open area into 43 new offices and two new multi-user accessible restrooms. This work is being done between grid lines 9 &11 and C.5 & E.8. To construct four new workstations between grids 8 & 9 at grid line E.8. To demo 11 workstations and replace with three large offices north of grid line F, between grid lines 7 & 8. Demo and remove partitions between four offices to create two larger open areas 67 and 68. Add two new workstations north of grid line E and west of grid line 8. To add a partition at large storage area to create HIPPA Storage Room 04 and Plan Storage Room 05. This building is fully fire sprinkled and sprinklers are used for building area increase. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/7/201112/7/201112/7/2011PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in10/11/201110/12/201110/12/2011APASS
DetailsTroy Cobbley
See the area with todays date where sprinkler piping can be covered.
INSP-Final Inspection9/6/20119/6/20119/6/2011PCANC
DetailsTroy Cobbley
Wrong permit called for inspection per Lonnie.
INSP-Sprinkler Rough-in/Hydro9/1/20119/2/20119/2/2011APASS
DetailsTroy Cobbley
Above ground hydro test and rough-in passed. See city approved plans for minor corrections needed prior to a final sign off.
INSP-Sprinkler Rough-in8/18/20118/18/20118/18/2011PPART
DetailsForrest France
Overhead rough-in at the new restrooms as marked on approved plan set with today's date are approved for ceiling cover.
INSP-Sprinkler Rough-in8/17/20118/17/20118/17/2011PCANC
DetailsTroy Cobbley
Canceled due to inspection load and time constraints. No inspection performed.