Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberFIR11-00354
StatusFinaled
Name DELTA FIRE SYSTEMS
Site Address 1111 W JEFFERSON ST
Project NameBOISE INC 1ST FLOOR
Customer Number 
ePlanReviewNo
Description
Quick Permit
Add and relocate sprinklers to accommodate new wall and ceiling configuration.

(BOISE – 1st FLR REMODEL) Minor remodel to create additional individual offices from open office area. Work to include: construction of one non-combustible full height partition wall, demo an existing print room, new light switching, new accessible door / hardware, relocate duct and diffuser, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. PLAN MODIFICATION Sumitted 2-23-11: plan mod is to add an additional 8ft. long interior non bearing wall. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/2/20118/3/20118/3/2011APASS
DetailsForrest France
Fire sprinkler permit finaled.