INSP-Final Inspection | 12/27/2011 | 12/27/2011 | 12/27/2011 | P | PASS |
Forrest France
|
|
|
Repair completed, final inspection and testing passed. Fire sprinkler permit finaled.
|
INSP-Final Inspection | 12/22/2011 | 12/23/2011 | 12/23/2011 | A | PART |
Forrest France
|
|
|
Final walkthrough completed acceptable. Final pending repair of the flow switch at system #2.
|
INSP-Final Inspection | 12/1/2011 | 12/2/2011 | 12/1/2011 | P | CANC |
Forrest France
|
|
|
Call Doug Funk at above # 30 minutes prior to inspection Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 10/19/2011 | 10/20/2011 | 10/20/2011 | P | PART |
Forrest France
|
|
|
2nd floor hydrostatic test passed.
|
INSP-Sprinkler Rough-in/Hydro | 10/18/2011 | 10/19/2011 | 10/19/2011 | P | PART |
Forrest France
|
|
|
1st floor hydrostatic testing passed. 2nd floor test failed due to pressure loss at the guage and visible leakage at the system side of the riser manifold.
|
INSP-Sprinkler Rough-in/Hydro | 10/12/2011 | 10/13/2011 | 10/13/2011 | A | FAIL |
Troy Cobbley
|
|
|
The overhead hydro tests on both systems failed.
|
INSP-Sprinkler Rough-in/Hydro | 10/12/2011 | 10/12/2011 | 10/12/2011 | P | CANC |
Troy Cobbley
|
|
|
Cancelled. Overbooked - rescheduled for tomorrow.
|
INSP-Sprinkler Rough-in | 10/7/2011 | 10/7/2011 | 10/7/2011 | P | PART |
Forrest France
|
|
|
Verified corrections, overhead work approved for cover.
|
INSP-Sprinkler Rough-in | 10/6/2011 | 10/7/2011 | 10/7/2011 | A | FAIL |
Forrest France
|
|
|
Overspaced head at the 2nd floor, one pendent head at the 2nd floor and three pendent heads at the 1st floor are too close to light fixture junction boxes.
|
INSP-Sprinkler Rough-in | 10/5/2011 | 10/6/2011 | 10/6/2011 | P | CANC |
Forrest France
|
|
|
overbooked
|
INSP-Sprinkler Rough-in | 10/4/2011 | 10/5/2011 | 10/5/2011 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Conference | 10/4/2011 | 10/4/2011 | 10/4/2011 | P | DONE |
Forrest France
|
|
|
Regarding UG flushing schedule.
|
INSP-Sprinkler Rough-in/Hydro | 9/29/2011 | 9/30/2011 | 9/30/2011 | P | PASS |
Forrest France
|
|
|
UG fire supply line hydrostatic test passed.
|
INSP-Sprinkler Rough-in/Hydro | 9/27/2011 | 9/28/2011 | 9/28/2011 | A | NR |
Forrest France
|
|
|
ug r/i hydro//Brian Phone #: ###-####
|
INSP-Sprinkler Rough-in | 9/7/2011 | 9/8/2011 | 9/8/2011 | P | PART |
Forrest France
|
|
|
Remainder of the UG fire supply line to the point of connection at the property line approved for cover.
|
INSP-Sprinkler Rough-in | 9/7/2011 | 9/7/2011 | 9/7/2011 | P | CANC |
Forrest France
|
|
|
ug cover//Brian Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
|
INSP-Sprinkler Rough-in | 8/31/2011 | 8/31/2011 | 8/31/2011 | P | PART |
Forrest France
|
|
|
UG fire supply line IBR only okayed for cover.
|