Permit Number | FIR11-00419 |
Status | Finaled |
Name |
ALARM STAR
|
Site Address |
8049 W FAIRVIEW AVE
|
Project Name | SHOPKO PLAZA-CITY BUFFET |
Customer Number | |
ePlanReview | No |
Description |
9/20/11 UPDATE: The occupant load has since been revised to 299, thus not requiring a manual fire alarm system (see attached approval from building plan review). 9/2/11: This quick permit is to provide two monitor modules for two new hood suppression systems and one new monitor module for duct detector (provided by others) monitoring/HVAC shutdown. NOTE: This permit scope of work does not include any notification devices. This occupancy type and load requires a manual fire alarm system that will require a separate permit. There are no written review comments. Associated building permit: BLD11-00380 (CITY BUFFET ASIAN RESTAURANT) Remodel combining two former spaces (approximately 2,700 sq. ft. and 5,400 sq. ft.) changing occupancy into a new 7,924 sq. ft. assembly restaurant space in existing shopping center per approved plans. Work to include select interior demolition of non-structural walls, finishes, electrical, mechanical, & plumbing with modifications to sprinkler and alarm system to be under separate permit as regulated by the fire department. There is an existing 1-hour fire rated wall creating the boundaries between tenants on north and south. Construct new walls to create the entrance / check-in area; kitchen / preparation area; storage, cooler , freezer units; accessible men's & women's restrooms and accessible route; and a private dining area. Interior finishes, electrical, mechanical, plumbing, sprinkler, alarm and Type I grease duct, hood & exhaust system and Type II hood & exhaust system with non-combustible support to structure above. NOTE: This existing building is fully fire sprinklered with 60 feet clearance all around for unlimited area (includes Shopko & strip mall areas). Occupancy use groups other than "B/M/F/S" cannot exceed 10% of existing building area under original UBC codes. The three "A2" occupancy max out the allowed 10% allowed for original buidling review process. drs
|