INSP-Final Inspection | 7/13/2012 | 7/16/2012 | 7/16/2012 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection and walkthrough.
|
INSP-Sprinkler Rough-in | 7/16/2012 | 7/16/2012 | 7/16/2012 | P | PASS |
Troy Cobbley
|
|
|
Forward flush passed.
|
INSP-Final Inspection | 7/12/2012 | 7/12/2012 | 7/12/2012 | P | PEND |
Forrest France
|
|
|
|
INSP-Conference | 7/6/2012 | 7/6/2012 | 7/6/2012 | A | DONE |
Forrest France
|
|
|
Regarding off site monitoring.
|
INSP-Sprinkler Rough-in/Hydro | 6/20/2012 | 6/21/2012 | 6/21/2012 | A | PART |
Forrest France
|
|
|
Concluded satisfactory 24 hr. pneumatic test of the dry system within allowable leakage per NFPA 13 at 1/2 psi.
|
INSP-Sprinkler Rough-in/Hydro | 6/20/2012 | 6/20/2012 | 6/20/2012 | P | PART |
Forrest France
|
|
|
Begin 24 hr. air test of the new dry system @44psi guage.
|
INSP-Sprinkler Rough-in/Hydro | 5/29/2012 | 5/29/2012 | 5/29/2012 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed on the second try.
|
INSP-Sprinkler Rough-in/Hydro | 5/29/2012 | 5/29/2012 | 5/29/2012 | A | FAIL |
Troy Cobbley
|
|
|
Dry system hydro test failed due to visable drop of pressure on the guage. Rescheduled for this afternoon.
|
INSP-Sprinkler Rough-in/Hydro | 5/22/2012 | 5/22/2012 | 5/22/2012 | P | PART |
Forrest France
|
|
|
Parking garage dry system work completed.
|
INSP-Sprinkler Rough-in | 5/16/2012 | 5/16/2012 | 5/16/2012 | P | PART |
Forrest France
|
|
|
Remainder of the garage level dry system okayed for cover. Also completed satisfactory hydrostatic test of the 1st floor wet system.
|
INSP-Sprinkler Rough-in/Hydro | 5/8/2012 | 5/9/2012 | 5/9/2012 | A | PART |
Forrest France
|
|
|
2nd floor wet system overhead hydrostatic test passed.
|
INSP-Sprinkler Rough-in/Hydro | 5/7/2012 | 5/7/2012 | 5/8/2012 | P | PART |
Forrest France
|
|
|
3rd floor overhead hydrostatic testing passed. Remainder of the soffits at the 1st floor core area okay for cover.
|
INSP-Sprinkler Rough-in/Hydro | 4/25/2012 | 4/25/2012 | 4/26/2012 | P | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test and flush completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 4/25/2012 | 4/25/2012 | 4/26/2012 | A | PART |
Forrest France
|
|
|
The remainder of the third floor corridor coverge at the sheetrock soffits approved for cover. Also okayed storage, pantry and elevator machine rooms on the 1st floor.
|
INSP-Sprinkler Rough-in | 4/24/2012 | 4/24/2012 | 4/25/2012 | P | PART |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 4/16/2012 | 4/16/2012 | 4/19/2012 | P | PART |
Forrest France
|
|
|
Ref. stamped plans for dated field notes at the 1st floor sheetrock ceilings okay to cover.
|
INSP-Sprinkler Rough-in | 4/9/2012 | 4/10/2012 | 4/10/2012 | A | PART |
Forrest France
|
|
|
See locations marked and dated on approved plan set okay for cover at the first floor garage and common areas.
|
INSP-Sprinkler Rough-in | 4/3/2012 | 4/4/2012 | 4/4/2012 | A | PART |
Forrest France
|
|
|
Inspection for cover at the 2nd floor core common area soffits, five 3rd floor showers, and the 1st floor north wing under stair rough-in approved.
|
INSP-Sprinkler Rough-in | 3/30/2012 | 3/30/2012 | 3/30/2012 | P | PART |
Forrest France
|
|
|
Remainder of 3rd floor tenant rooms at the south wing approved for cover.
|
INSP-Sprinkler Rough-in | 3/26/2012 | 3/27/2012 | 3/30/2012 | P | PART |
Forrest France
|
|
|
Reference approved plan set for locations marked and dated as okayed for cover at the 3rd floor south end.
|
INSP-Sprinkler Rough-in | 3/21/2012 | 3/21/2012 | 3/21/2012 | P | PART |
Forrest France
|
|
|
Overhead work approved for cover at the 2nd floor corridor 234 and the 3rd floor north wing shower ceilings.
|
INSP-Sprinkler Rough-in | 3/15/2012 | 3/15/2012 | 3/16/2012 | P | PART |
Forrest France
|
|
|
Overhead approved for cover at portions of the first floor, second floor corridor and third floor NW rooms 314, 315, 316, laundry and utility rooms as marked and dated on stamped plan set. Discussed obstruction issues with exit sign location at the 3rd floor.
|
INSP-Sprinkler Rough-in | 3/9/2012 | 3/9/2012 | 3/9/2012 | A | PART |
Forrest France
|
|
|
1st floor lobby, rental office and common area rough-in inspection complete. Discussed coverage issues at 1st floor stairways north and south wings.
|
INSP-Sprinkler Rough-in | 3/6/2012 | 3/7/2012 | 3/7/2012 | A | PART |
Forrest France
|
|
|
See approved plan set for annotated locations including the 3rd floor north wing tenant and common corridor, 1st and 2nd floor north wing tenant showers, 1st and 2nd floor north wing common corridors, 2nd and 3rd floor south and north stairways.
|
INSP-Sprinkler Rough-in | 1/9/2012 | 1/10/2012 | 1/11/2012 | A | PART |
Forrest France
|
|
|
Overhead rough-in inspection at the second floor south half completed. See dated and marked locations on plan set.
|
INSP-Sprinkler Rough-in | 1/4/2012 | 1/4/2012 | 1/4/2012 | A | PART |
Forrest France
|
|
|
1st and 2nd floor corridors north half rough-in okayed per plan annotations.
|
INSP-Sprinkler Rough-in | 12/27/2011 | 12/27/2011 | 12/27/2011 | P | PART |
Forrest France
|
|
|
2nd floor north wing rough-in per dated plan annotations okayed as noted. Modifications to pipe routing, added heads at each unit bathroom to be reflected on revised drawings. Discussed possible light fixture obstructions, heads at two concealed spaces not yet installed, one missing hanger replaced while on site. Notified general contractor no sheetrock is to be installed prior to a rough-in approval.
|
INSP-Sprinkler Rough-in | 12/20/2011 | 12/21/2011 | 12/21/2011 | A | PART |
Forrest France
|
|
|
1st floor corridor 110 main and branch line tie-ins passed rough-in. Additional coverage at one area and missing seismic bracing to be verified when complete- ref. dated annotation.
|
INSP-Sprinkler Rough-in/Hydro | 11/28/2011 | 11/28/2011 | 11/28/2011 | A | PART |
Forrest France
|
|
|
Rough-in at rooms per dated annotations on plans only.
|
INSP-Sprinkler Rough-in | 11/22/2011 | 11/23/2011 | 11/23/2011 | A | PART |
Forrest France
|
|
|
Verified retainers at beam clamps in the parking garage, rough-in at units 101 thru 108 first floor okayed. See dated plan annotations.
|