Permit Number | FIR11-00505 |
Status | Finaled |
Name |
DELTA FIRE SYSTEMS
|
Site Address |
1111 W JEFFERSON ST
|
Project Name | BOISE Inc First Floor |
Customer Number | |
ePlanReview | No |
Description |
Quick Permit
Add one sprinkler to a new office.
(BOISE – 1st FLR REMODEL) Minor remodel to create an additional individual office from open office area. Work to include: construction of two non-combustible full height partition wall, new light switching, new accessible door / hardware, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
|