Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR11-00517
StatusFinaled
Name ALLIED GENERAL FIRE & SECURITY
Site Address 13626 W BALDCYPRESS ST
Project NameTRADITIONS - SECTION A
Customer Number 
ePlanReviewNo
Description
Quick Permit
Install a 6" in builder riser and 5' of 6" C-900 piping.

TRADITIONS AT BOISE LLC- Section A- Section 'A' (West Wing) to construct a four story 1-hour fire rated, wood frame, 52-unit, commercial apartment building of 25,296 sq. ft.(6412 s.f. - 1st fl / 6,497 s.f. - 2 thru 4th fl.). There are 12 units @742 s.f.; 4 @ 751 s.f.; 4 @ 553 s.f. and 12 @ 568 s.f.. A 2-hour combination fire wall & Horizontal exit is being constructed between the West Wing and Center Core portion for allowable area compliance. This building is fully sprinkler W/ 13R system for allowable area increase, addition of 1-story and for occupancy use compliance; alarm with notification system; 1-hour exit corridors connecting the 2-hour stair enclosure and horizontal exit; and mechanical shaft assemblies are indicated as 2-hour rated. Each floor has one exit into a rated stair enclosure and 1 exit through a horizontal exit. All work to be in accordance with the reviewed plans, red-lined notres on plans and attached plan review comments & conditions of all provided plan reviews. CUP10-00052 DRH10-00222
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/8/20126/8/20126/8/2012APASS
DetailsTroy Cobbley
Permit finaled
INSP-Conference5/18/20125/21/20125/21/2012ACANC
DetailsTroy Cobbley
Wrong permit called in for life safety conference.
INSP-Sprinkler Rough-in3/20/20123/21/20123/21/2012APASS
DetailsTroy Cobbley
See the fourth floor of the city approved plans for additional rooms where the sprinkler piping can be covered. I noted that there was an open sprinkler pipe above the ceiling of the trash room.
INSP-Sprinkler Rough-in1/17/20121/17/20121/17/2012PPASS
DetailsTroy Cobbley
See the city approved plans for the west side, fourth floor, resident rooms where the sprinkler piping can be covered now that the tenting is done. Raul repaired the tenting in rooms 404, 407 and 408 while I waited. The approval for cover does not include the west side, fourth floor corridor as that piping has not been installed yet.
INSP-Sprinkler Rough-in1/13/20121/17/20121/17/2012AFAIL
DetailsTroy Cobbley
The tenting had only been completed in acouple of rooms. Will re-inspect when I come back for the underground flush this afternoon.
INSP-Sprinkler Rough-in/Hydro10/14/201110/17/201110/17/2011APASS
DetailsTroy Cobbley
Only the IBR has been installed at this time. Piping is ok to cover.
INSP-Sprinkler Rough-in10/13/201110/13/201110/13/2011PCANC
DetailsTroy Cobbley
Overbooked - will have to be rescheduled