Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR11-00542
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 190 E BANNOCK ST
Project NameSLRMC
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of relocating sprinklers in three areas on the fifth floor to accommodate new wall and ceiling configuration. Sprinklers will be changed to quick response type.


Building Department Scope:

(ST. LUKES REGIONAL MEDICAL CENTER) Remodel a 1,140 sq. ft. portion of the fifth floor for group therapy, waiting area, dictation and consult uses in east tower of existing hospital building, excluding vertical circulation areas per approved plans. Work to include: Selective demolition work per plans; cold-formed metal framing; acoustical panel ceiling system; building insulation; penetration firestopping; joint sealants; hollow metal frames; new doors and associated hardware; gypsum board and related interior finishes in compliance with chapter 8 of the 2009 IBC; resilient base and accessories; new flooring; fire sprinkler/alarm systems, controls, voice and data communication system work; electrical, plumbing, and mechanical work. All work per the approved plans, attached plan review report, and all applicable codes. NOTE: This building is fully fire sprinklered for an I-2 Occupancy and as a high-rise building. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department and will require a separate permit. A certificate of completion shall be issued when work is completed and a final inspection has occurred. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/18/20121/18/20121/18/2012PPASS
DetailsForrest France
Fire sprinkler work passed final inspection.
INSP-Final Inspection1/9/20121/9/20121/9/2012PPART
DetailsForrest France
Final pending ceiling tile and escutcheons.
INSP-Sprinkler Rough-in12/14/201112/15/201112/15/2011APART
DetailsForrest France
Patient waiting and consultation rooms as marked and dated on approved plans okayed to cover.
INSP-Sprinkler Rough-in11/23/201111/28/201111/28/2011APART
DetailsForrest France
Overhead work at the exam, consult and housekeeping areas as marked and dated on approved plans okayed for cover.
INSP-Sprinkler Rough-in10/7/201110/7/201110/7/2011PPART
DetailsForrest France
One room as marked and dated on plans is approved for ceiling cover.
INSP-Sprinkler Rough-in10/6/201110/6/201110/7/2011PCANC
DetailsForrest France
Overbooked