Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR11-00632
StatusFinaled
Name SIMPLEX GRINNELL
Site Address 11311 W CHINDEN BLVD
Project NameHP – BLDG 3 & 5 LINK – DR. CRU
Customer Number 
ePlanReviewNo
Description
12-28-11 PLAN MODIFICATION (devices affected): This plan modification is to correct the location of the tenant from the previously incorrect position, incorporate redline/review comments, and show new configuration of notification devices.

11-25-11: This fire alarm permit is to add and relocate notification to accommodate a tenant remodel and relocate a pull station. New devices are to be tied in to existing circuits.
Associated building permit: BLD11-01490 (HP – Bldg 3 & 5 link – DR. CRUMP) Permit is to remodel to an existing open office area to now be a dentist office. Work to include: [construction of one non-combustible full height partition walls to: separate this dentist area from the other areas, to create a unisex restroom, create a waiting room, a sterilization room, and screen four different chair areas], new light switching, new accessible doors / hardware, relocate duct and diffuser, install new plumbing, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/5/20121/5/20121/5/2012PPASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection12/29/201112/30/201112/30/2011APART
DetailsForrest France
Completed functional testing for the new notification appliances and the relocated MP at the remodel area. Missing stamped plan modification set on site, will verify documents and sign record of completion forms at next project visit.