Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberFIR11-00651
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 782 S AMERICANA BLVD
Project NameSummit Dental Office
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of a new wet and dry system. 6” underground supplies a 6” backflow preventer, 6” wall PIV and 6” header. The 6” header supplies a 4” wet riser and a 6” dry riser. The attic system utilizes small orifice sprinklers.

Note: Underground was under permit FIR11-00578

Plan Mod #1
Redesigned front canopy and dry system


Building Department Scope:

Summit Dental Office - PLAN MOD Resubmittal 10-12-11 new structural plan sheets S0.01, S1.01, S4.01, S5.01, S5.02, S6.01, S6.02, GEOTECH FOUNDATION RECOMMENDATIONS CHANGING CAISONS TO MICRO PILE FOUNDATION SUPPORT SYSTEM. DRS To construct a new 7,950 square foot, two story wood framed dental office building and related site improvements. First Floor: 7,465 sq. ft., Second Floor: 485 sq. ft.. This building will be fully fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/11/20127/12/20127/12/2012APASS
DetailsTroy Cobbley
Permit finaled. Forward flush passed.
INSP-Final Inspection7/12/20127/12/20127/12/2012PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro6/14/20126/14/20126/14/2012PPART
DetailsForrest France
Wet system passed hydrostatic test.
INSP-Sprinkler Rough-in/Hydro6/13/20126/13/20126/13/2012PNR
DetailsForrest France
Hydrostatic test of the wet system is not yet ready per contractor.
INSP-Sprinkler Rough-in6/12/20126/13/20126/13/2012PPART
DetailsForrest France
Okay to cover upright heads at exterior soffits east side.
INSP-Sprinkler Rough-in6/12/20126/12/20126/12/2012PPART
DetailsForrest France
Overhead rough-in and cover inspection for the CPVC wet system piping and drop sprinklers passed. Grid ceiling cover approved.
INSP-Sprinkler Rough-in5/10/20125/10/20125/10/2012APART
DetailsForrest France
Regarding overhead wet system rough-in.
INSP-Sprinkler Rough-in4/11/20124/12/20124/12/2012APART
DetailsForrest France
Rough-in okay for cover at the entry vestibule area sheetrock ceilings. Discussed cold cavity protection.
INSP-Sprinkler Rough-in/Hydro4/9/20124/10/20124/10/2012APART
DetailsForrest France
Concluded satisfactory 24 hr. air test of the new dry system.
INSP-Sprinkler Rough-in/Hydro4/9/20124/9/20124/9/2012PPART
DetailsForrest France
Begin dry system pneumatic test at 1:30 PM@ 40psig.
INSP-Sprinkler Rough-in/Hydro4/3/20124/4/20124/4/2012APART
DetailsForrest France
Overhead hydrostatic test of the new dry system passed. Inspection for seismic brace attatchments at the wet system mains completed.
INSP-Sprinkler Rough-in/Hydro4/3/20124/3/20124/4/2012PPART
DetailsForrest France
INSP-Supply line flush3/19/20123/19/20123/19/2012PPART
DetailsForrest France
UG fire supply line flush completed acceptable.
INSP-Sprinkler Rough-in3/16/20123/16/20123/16/2012PPART
DetailsForrest France
Discussed coverage at combustible concealed spaces. Remainder of dry system work at the second floor area okayed.
INSP-Sprinkler Rough-in3/15/20123/15/20123/16/2012PPART
DetailsForrest France
Dry system rough-in inspection completed satisfactory.