Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR11-00667
StatusFinaled
Name DELTA FIRE SYSTEMS
Site Address 1111 W JEFFERSON ST
Project NameBOISE Plaza 5th floor
Customer Number 
ePlanReviewNo
Description
Quick Permit
Add and relocate sprinklers to accommodate new wall and ceiling construction.

(PERKINS COIE, LLP – BOISE – Fifth floor NW corner) Minor remodel to create additional individual offices from open office area. Work to include: construction of one non-combustible full height partition walls to create three new offices and one new storage room, new light switching, new accessible doors / hardware, relocate duct and diffuser, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/5/20124/6/20124/9/2012APASS
DetailsForrest France
Plan modifications field verified. Fire sprinkler permit finaled.
INSP-Final Inspection4/5/20124/5/20124/5/2012PPART
DetailsForrest France
Need revised plan set on site for review.
INSP-Sprinkler Rough-in1/4/20121/5/20121/5/2012AFAIL
DetailsForrest France
Head spacing at the new storage room exceeds 130ft2, missing retainers at beam clamps.