Permit Information
Permit NumberFIR12-00134
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 350 N MILWAUKEE ST Unit: 2128
Project NameBTS #2128 - CHAMPS
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of adding and relocating sprinklers to accommodate new wall and ceiling construction.

Demo permit and shell protection was FIR12-00127


Building Department Scope:

(CHAMPS / Foot Locker - BOISE TOWNE SQUARE - SPACE # 2128) To remodel an existing 4,505 square foot retail store by combining it with one small tenant space and part of the mall common area increasing this tenant space to 5,950 square feet. Work to include: [installation of interior non-bearing partition walls to create: [a stockroom, a sales area, unisex accessible restroom, fitting rooms, accessible fitting room, and a hallway], installation of new flooring throughout, construction of a new storefront area, installation of suspended ceiling system per CISCA 0-2, new lighting, revise mechanical ducting only, new plumbing, and interior finishes in compliance with ch. 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks (Racking permit attached to this permit/plans under case number BLD11-03037). NOTE: a separate sign permit for interior mall signage is required before sign installation. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/4/20124/4/20124/4/2012PPASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection4/2/20124/2/20124/2/2012PFAIL
DetailsTroy Cobbley
Three upright sprinkler heads are painted/covered over the sales floor, two esch. are missing at the main exit, sprinkler protection needs to be provided in the empty spaced created by the new tenant demizing wall as discussed.
INSP-Sprinkler Rough-in3/29/20123/29/20123/30/2012PPASS
DetailsTroy Cobbley
The sprinkler piping to the two pendant heads at the entrance can be covered.
INSP-Sprinkler Rough-in3/16/20123/16/20123/16/2012PPASS
DetailsTroy Cobbley
The sprinkler piping above the hard lids and soffits, as marked on the plans, can be covered. I noted that the head symbol on the drawing for the concealed heads is not included in the head legend and the G4 concealer pendant as shown on the plans has been replace with a G5 pendant head. Per phone conversation with Tim Frost this replacement head is ok.